1.What is exposure?
- A. Unprotected risk
- B. Probability of risk occurrence
- C. Once the risk occurs, it will cost to deal with it
- D. Once the risk occurs, the project will cause losses
风险敞口是指什么?
- A、指未加保护的风险
- B、风险发生的概率
- C、风险一旦发生将要花费的应对成本
- D、风险一旦发生项目将要造成的损失
2.According to the figure below, in iteration 5, there was an increase in the user story point. However, the team completed all the work it promised to complete in this iteration, and the existing estimation did not change. What can be inferred from this information?
- A. Some work has been removed from the product to-do list
- B. Some work has been added to the product to-do list
- C. The team is speeding up
- D. Team speed is slowing down
根据下面的图,在迭代 5 中,用户故事点有 1 个增加,但是,团队完成了其在这个迭代中承诺要完成的所有工作,并且现有的估算不改变。从这些信息中,可以推断出什么?
- A、有些工作从产品待办事项中被移除了
- B、有些工作被增加到了产品待办事项中
- C、团队速度在加快
- D、团队速度在降低
3.What is the main purpose of the sprint review meeting?
- A. Demonstrate the completed functions in the iteration
- B. Discuss the good, bad and improvement methods
- C. Prioritizing and estimating user stories for the next iteration
- D. Provide the update of user story status in the process separately
Sprint 评审会的主要目的是什么?
- A、演示迭代中已完成的功能
- B、讨论做得好的地方、不好的地方以及改进的方法
- C、为下一个迭代进行用户故事的优先级排序和估算
- D、单独提供流程中用户故事状态的更新
- 上一篇:珠海ACP网课|在线模拟题
- 下一篇:珠海ACP培训官方授权报名机构模拟题