1.项目组发现,如果能够在原有产品中增加一个范围以外的功能,可能增加客户续签下一个合同的可能性,对于这样的机会,项目组应该?
A.上报给领导层,进行变更申请
B.采用分享措施,寻找一个不错的合作方一起分享成功
C.增加资源,提高机会
D.承认这个机会的存在,但不主动采取措施.
2.During the Plan Risk Responses process, the team is discussing ways to deal with a risk. They have come up with the following options: a) outsource the work, b) provide more training to the team members, c) wait to see if the risk actually happens, d) ignore the risk and e) do the risky activity sooner in the project. Which of the following is a risk response strategy that was forgotten in the above situation?
A. Remove the task causing the risk from the project.
B. Purchase insurance to cover the anticipated cost.
C. Assign the task to a more experienced person to handle.
D. Prototype the product.
在风险应对计划编制过程中,团队需要讨论处理风险的方法。他们提出以下选择: a)工作外包;b)为团队成员提供更多的培训;c)等待观察风险是否真的发生;d)忽略风险;以及e)快速完成项目中带有风险的任务。下面哪一项所代表的风险应对战略是上面五种情况所遗漏的?
A. 从项目中删除带有风险的任务
B. 购买保险来覆盖预期成本
C. 将任务分配给更有经验的人来完成
D. 为产品制作原型
3.根据刚颁布的一项新法规,公司启动了“碧水蓝天”环境治理项目。项目的现场准备工作必须在政府的环境听证会之后才能开始。这是以下哪项的例子?
选择性依赖关系,外部依赖关系
B.强制性依赖关系,调整性依赖关系
强制性依赖关系,外部依赖关系
D.强制性依赖关系,内部依赖关系
- 上一篇:新疆PMP培训报名|在线模拟题