欢迎大家来到思摩特西安PMP考试认证培训,今天总结了我们部分学员的一些易错PMP考试试题给大家分享下。
1. The Manage Team process is part of what process group?
A. Planning
B. Executing
C. Monitoring and Controlling
D. Closing
1. 管理团队过程属于哪一个过程组?
A. 规划
B. 执行
C. 监控
D. 收尾
2. When a project is executed under contract, the contractual provisions will generally be considered as ( ) for the project.
A. Constraints
B. Exclusions
C. Deliverables
D. Provisions
2. 当一个项目在合同下执行时,合同条款通常被认为是项目的( )。
A. 制约
B. 除外
C. 可交付成果
D. 规定
3. Which of these is accurate regarding the Develop Schedule process?
A. Schedules are optimized such that all non-critical activities have a zero total float.
B. The critical path method is a schedule network analysis technique that is performed using the schedule model.
C. Schedule compression shortens the project schedule while changing the project scope.
D. Schedule network analysis is a technique carried out once the schedule is approved.
3. 关于制定进度计划,以下哪一个是准确的?
A. 进度是优化的,这样所有非关键的活动都没有浮动时间
B. 关键路径方法是使用进度模型执行的进度网络分析技术
C. 进度压缩缩短项目进度,同时改变项目范围
D. 进度网络分析是一项在计划被批准后实施的技术