1.If an XP method is used in a project, customer testing is one of them
- A. Technology to decide whether the software can be used by customers as early as possible
- B. Tools for customer acceptance of business requirements
- C. The technology that determines whether the customer will use this software feature
- D. A test to determine whether the customer will buy the product
如果一个项目使用 XP 方法,客户测试就是一种:
- A、决定这个软件是否可以尽早给客户使用的技术
- B、客户验收商业需求的工具
- C、决定客户是否会使用这个软件功能的技术
- D、决定客户是否会购买这个产品的测试
2.When is the detection method applicable?
- A. When the business requirements of an iteration are vague or insufficient
- B. A technology needs to be deeply understood and used for a period of time, but it needs to be debugged for a problem
- C. There is not enough time to refactor, but a specific problem needs to be solved
- D. A specific technical problem detection: from the generation of the problem until the problem is solved
探测的方法一般在什么时候适用?
- A、一个迭代的商业需求比较模糊或者不充分时
- B、一项技术需要被深入理解并且使用一段时间,但是需要一个问题的调试时
- C、没有充足的时间重构,但是需要解决一个特定的问题
- D、一项特定的技术问题探测:从问题的产生一直到问题解决才停止
3.What is one of the purposes of the burn out diagram?
- A. Identify and communicate upcoming milestones
- B. Show the level of input and resource utilization
- C. Identify dependencies between sprint and iteration
- D. Shows how much time is needed for the remaining work
燃尽图的一个目的是什么?
- A、识别和沟通即将到来的里程碑
- B、显示投入和资源利用的水平
- C、识别冲刺和迭代之间的依赖
- D、显示剩余的工作还需要多少时间