欢迎大家来到思摩特南昌PMP培训中心,今天总结了我们部分学员的一些易错PMP考试试题给大家分享下:
1. You are managing a project that has a task to translate several pages of a document into Spanish. This is similar to a project done last year when a document was translated into German. You are not sure how long it will take to translate into Spanish, so you look at the project plan from the German translation and use that activity duration for your current project. What pe of estimating is this an example of?
A. Hypothesis
B. Parametric Estimating
C. Analogous Estimating
D. What-if Scenario Analysis
1. 你正在管理一个项目,该项目的任务是将文档的几页翻译成西班牙文。这类似于去年的一个项目,当时一份文件被翻译成德语。你不确定需要多长时间才能转换成西班牙语,因此你可以从德语翻译中查看项目计划,并使用该活动的持续时间作为你当前项目的持续时间。这是一个什么样的估算呢?
A. 假设
B. 参数估算
C. 类比估算
D. 假设情景分析
2. You are managing an oil-drilling project. With oil at $143 per barrel, this could be a highly lucrative project. However, there is a chance that the rice of oil will drop below $105 per barrel, which would eliminate the profit in the project. This is an example of:
A. Requirement
B. Assumption
C. Risk
D. Constraint
2. 你在管理一个石油钻探项目。如果油价达到每桶143美元,这将是一个非常有利可图的项目。然而,有可能石油价格将降至每桶105美元以下,这将消除该项目的利润。这是以下哪种例子:
A. 需求
B. 假设
C. 风险
D. 支援
3. Which of the following statements is incorrect?
A. Developing a project team is the responsibility of the project manager.
B. A project manager must not acquire resources needed to develop effective project teams.
C. High team performance can be achieved using open and effective communications.
D. Teamwork is a critical success actor for a project.
3. 下列哪个陈述是不正确的?
A. 建设项目团队是项目经理的职责
B. 项目经理不必获得建设有效项目团队所需的资源
C. 高绩效团队可以通过开放和有效的沟通来实现
D. 团队合作是一个项目成功的关键因素