1. In terms of the items in the product backlog,what is correct?
- A、Refine them and make estimations before including them into the product backlog
- B、Refine them and make accurate estimations
- C、Refine them and estimate them in sprint plan
- D、Refine them gradually and estimate them in iteration plan
有关待办列表中的事项,下列哪一种说法是正确的?
- A、应对他们进行精细化,并在列入待办列表之前估算
- B、应对他们进行精细化,并准确估算
- C、应对他们进行精细化,并在 sprint 计划中估算
- D、应对他们]进行逐步精细化,并在迭代( iteration)计划中进行估算
2. Agile team leader notices that the PO does not have time verify the completed work andchecking demands,what should he do?
- A、Report the situation to the management level
- B、Prepare one memo and give it to the PO
- C、Wait for the standup meeting to confront the product owner
- D、Meet directly with the PO obtain their command to engage in the project
敏捷团队领导注意到,产品负责人一直没有时间验证已完成的工作以及检查需求,应该做什么?
- A、将这种情况上报给管理层
- B、准备一份备忘录,并把它给到产品负责人
- C、等到每日站会上与产品负责人交谈
- D、直接找 PO 获得关于项目的指令
3. During iteration planning,a team committed to implementing 10 stories. Coding has been completed and basic regression tests are passing. There are 12 bugs pending. Some of them are blocking few tests that execute some of the paths in the story. The fixes for these bugs were checked in on the last day of the iteration,but they have not been tested。In such a scenario,the iteration is:
- A、Successful,because the basic functionality is implemented and is working
- B、Unsuccessful,because the tests have not all passed and few tests are still blocked
- C、Successful or unsuccessful depending upon the done criterion decided by the team
- D、Successful if the customer accepts it
在迭代规划过程中,一个团队致力于完成 10 个故事。编码已经完成,一些基本的测试也已经通过了。有 12 个缺陷还在待定工作中。而团队中的一些人则被故事的执行路径测试阻挡。在迭代的最后一天对缺陷进行测试,但测试却没有通过。在这种情况下,迭代是?
- A、成功的,因为基本功能都已完成和运行
- B、不成功,因为测试都没有通过
- C、成功或失败取决于团队决定的完成标准
- D、如果客户接受它就算成功