01、How might an agile team continuously improve its product?
A. By performing work breakdown structure reviews
B. By performing ongoing integration
C. By using comprehensive documentation to define team values
D. By performing integration testing near the end of a release
怎么样能使一个敏捷团队持续提高它的产品?
A.通过评审工作分解
B. 通过执行不间断的迭代
C.通过利用全面的文档来定义团队价值观
D.通过在将近发布末期时执行循环测试
02、If, during a sprint review, the product owner does NOT accept a user story or feature, what should the team do?
A. Mark the story as done because it would not be reviewed if it didn' t pass the acceptance
criteria written on the back of the card
B. Mark the user story as incomplete and collaborate with the product owner whether to
include the user story in a subsequent iteration
C. Postpone the sprint review until the user story is accepted
D. Remove the user story from the product backlog
在冲刺审查期间,如果产品负责人没有验收一个用户故事或者一个特性,那么团队应该: A.标记故事为完成,因为如果故事没有通过卡片背面的验收标准,那么它不会被审查
B.标记故事为未完成,并和产品负责人协商是否将此用户故事纳入到接下来的迭代中
C.此用户故事得到验收时才进行冲刺审查
D.从产品待办事项中移除改用户故事
03、In a self-assessment or reflection event, what is a likely topic a team will focus on?
A. Team standards that worked
B.Product owner risks
C. The programmer who authored the most bugs
D. Customer inconsistencies in requirements
在自我评估或反思中,敏捷团队会注重以下哪一个内容?
A.已执行的工作标准
B.产品负责人风险
C.编写最多错误的程序员
D.客户需求的不一致性