1.When developing user stories, what is the best way that users expect to verify?
- A. Acceptance test
- B. Import standard
- C. Completion criteria
- D. Want or don't want restrictions
在开发用户故事时,用户期望最好的验证方式是什么?
- A、验收测试
- B、入口标准
- C、完成的标准
- D、要或者不要的限制
2.Retrospectives provide an opportunity for the team to go to?
- A. Reflect and identify team / process / product / quality improvement actions at the end of each iteration
- B. Attend a mandatory meeting to share status with the team and ensure everyone is on track
- C. Confirm the project scope, quality, cost and time from the perspective of management
- D. At the beginning of the iteration, set goals and identify functions that can be delivered for the iteration
回顾会为团队提供一个机会去______?
- A、在每个迭代的结束时反映并且识别团队/过程/产品/质量的改进措施
- B、参加一场强制性的会议以在团队中实现状态共享,确保每个人步入正轨
- C、从管理的角度确认项目的范围、质量、成本和时间的目标完成情况
- D、在迭代的开始,设置目标并且识别本迭代可以被交付的功能
3.What is the most appropriate way for a project team to be physically distributed in different places?
- A. Set up a small number of areas, each area of the team to complete a set of unrelated complete subsystems
- B. Through rich communication channels to ensure that in the same time zone, the same system
- C. Set up a small number of regions. According to the function pipeline distribution, the tasks of each region are designed in one place, coded in one place, and tested in another place
- D. Set up many areas, set up a small number of people in each area to develop and test some unrelated subsystems
对于一个物理上分布在不同地方的项目团队来说,什么是分布式团队最合适的方式?
- A、设立少量的地区,每个地区的团队完成一组不相关联的完整的子系统
- B、通过丰富的沟通渠道确保在同一时区、同一个系统中进行
- C、设立少量的地区,每个地区的任务根据功能流水线分布,设计在一个地方,编码在一个地方,测试在另外一个地方
- D、设立很多地区,在每个地区都设立少部分的人去开发和测试一些不相关的子系统