欢迎大家来到思摩特南昌PMP培训班,今天总结了我们部分学员的一些易错PMP考试试题给大家分享下:
1. The objective of a transformation project is to move an organization from one state to another state. The desired result of the change driven by the project is described as the:
A. Good state
B. Future state
C. Happy state
D. Transition state
1. 一个变革项目的目标是将组织从一个状态转移到另一个状态,期望的项目驱动的变革结果可以描述为:( )。
A. 好的状态
B. 未来状态
C. 幸福状态
D. 迁移状态
2. The term Progressive Elaboration incorrectly represents which of the following?
A. Scope creep
B. Rolling wave planning
C. Detailing out the product requirements developed during the initiation process.
D. Production of fabrication and construction drawings from the design drawings for a chemical plant.
2. 以下哪一项是代表渐进明细术语的错误说法?
A. 范围蔓延
B. 滚动式规划
C. 详细说明在启动过程中开发的产品要求
D. 从化工厂的设计图生成制造图和施工图。
3. Which document describes the project’s deliverables and the work required to create those deliverables?
A. Project authorization document
B. Project scope statement
C. Project scope management plan
D. Project charter
3. 那一份文件描述项目的可交付成果以及创建这些可交付成果所需要的工作?
A. 项目授权文件
B. 项目范围说明书
C. 项目范围管理计划
D. 项目章程